I can't remember if we've mentioned it on the blog before, but ever since we moved into our apartment, the building has been under construction. This is because the geniuses at JEDunn forgot to put a waterproofing layer underneath the brickwork when they originally put up the building, leading to significant water damage on some of the west and north-facing units (we face southeast, so our unit was spared). The patio doors also did not have the right water drainage design and would have to be replaced. Before we bought the condo, there was a big lawsuit between the HOA and JEDunn, and the agreement was that JEDunn would remedy their mistake and reconstruct the entire outside of the building.
We knew at the time of closing that there was going to be some construction on our building; in fact, that's one of the reasons we got such a great deal on the place (something tells me the previous owner wanted to get the heck out of here before construction hell broke loose). However, Dave and I agree that we were completely unprepared for the scope of the construction that was going to occur.
The process started sometime in June, when we were back in Berlin, so we came back in July to see the entire west side of our 7-story building covered in scaffolding, and then draped in heavy-duty plastic sheeting. The plan was to work counterclockwise around the building, so our unit would be worked on last. The reconstruction process, as far as I can tell, consists of the following steps:
1. Put up gigantic ugly scaffolding.
2. Cover windows on outside with Plexiglas to protect glass so you can (sort of) see out.
3. Drape plastic over scaffolding, thus hermetically sealing you into your unit.
4. Jackhammer every brick off of the exterior to the building.
5. Coat building with yucky-smelling waterproofing layer.
6. Rebrick.
7. Power wash.
8. Remove scaffolding.
Somewhere in there they also come into your apartment through the hallway, rip out the patio doors and edging, and replace them.
No big deal, right?
So far, the construction hasn't impacted us that much beyond waking us up with loud drilling, at 7:30 five days a week, jiggling some of our doorjambs our of alignment (a common exchange between Dave and I: "Is it just me, or did this door used to shut all the way?" "Is it just me, or have I straightened this picture five times in the last week?"), and making it increasingly difficult to get in and out of the building on workdays.
I've had a sense of foreboding for the last six months as I've seen the scaffolding creep around the building (literally, creep - it's taken months). The first scaffolding was taken down just before Christmas, meaning that those people had been sealed into their apartments for six months (and are understandably grumpy about it). Surprisingly, however, when the first scaffolding went up around the outside of our unit this week, I felt a sense of relief rather than anger - probably because this is the beginning of the end, and I don't have to wait anymore.
Dave and I drank our coffee this morning and watched out the window as orange-vested, hard-hatted guys laid down wood planks and metal crossbeams to strengthen the scaffolding structure. It kind of reminded me of that scene in "The Money Pit" when Shelley Long opens her medicine cabinet and finds a hole in the wall, with a construction guy on the other side holding her medication in his hand.
I was going to rush to get some shots of the scaffolding for the blog, but then laughed to myself as I remembered that this scaffolding is going to be there for MONTHS, and there will be plenty of opportunities to document the process. Stay tuned...